Interview key customer personnel to arrive at a consensus of the problems that exist | ||
| |
Determine if there have been any significant changes in operating practices and/or demands of the process that may have caused the capabilities of the existing system to be exceeded | ||
|
|
Review functional design documents to determine if any of the problems are inherent in the design | ||
| |
Monitor operation of the existing system against the intent of the functional design | ||
| |
Evaluate the performance of the control system hardware and software with respect to the demands of the process | ||
|
|
Evaluate application programs and HMI screens with respect to the functional requirements | ||
| |
Evaluate the adequacy of the sensors and control elements to operate in accordance with the intended functional design | ||
| |
Prepare a report of the findings and recommendations for alternative solutions | ||
| |
Develop basic control strategies | ||
| |
Prepare Process and Instrument Diagrams (P&ID's) | ||
| |
Develop information flow requirements to other control systems and to plant information system | ||
|
|
Develop operator interface requirements | ||
| |
Prepare preliminary functional specification | ||
| |
Define control system performance criteria | ||
|
|
Identify hardware and software manufacturers that can meet the performance criteria | ||
| |
Prepare a preliminary system block diagram (generic or vendor specific) | ||
| |
Finalize the P&ID's | ||
| |
Prepare a detail functional specification | ||
|
|
Prepare a control system specification for bid | ||
| |
Select an equipment and software vendor | ||
| |
Finalize the system block diagram | ||
|
|
Define outage and other restrictions | ||
| |
Develop a design basis | ||
| |
Develop a project scope | ||
| |
Prepare an installed cost estimate | ||
| |
Prepare a preliminary schedule | ||
| |
Software design including setting programming standards and procedures | ||||
| |
PLC Programming | ||||
|
|
Rockwell PLC 5 and Control Logix | ||||
|
|
GE Fanuc | ||||
|
|
Modicon | ||||
|
|
Siemens | ||||
|
|
DCS Programming | ||||
|
|
Emerson Process (WDPF and Ovation) | ||||
|
|
ABB (Bailey) | ||||
|
|
Bristol | ||||
|
|
HMI Programming | ||||
|
|
Intellution FIX | ||||
|
|
Rockwell Software (RS View and PanelView) | ||||
|
|
WonderWare | ||||
|
|
Emerson Process Ovation, Classic, and WEStation | ||||
|
|
ABB (Bailey) | ||||
| |
Operating Systems | ||||
|
|
Windows 2000 and XP | ||||
|
|
Linux | ||||
| |
Programming Languages and Databases | ||||
|
|
Visual Basic | ||||
|
|
C++ | ||||
|
|
SQL Server | ||||
|
|
Access | ||||
|
|
Management Tools | ||||
|
|
MS Word | ||||
|
|
MS Excel | ||||
|
|
MS Power Point | ||||
|
|
MS Access | ||||
|
|
MS Project | ||||
| |
Design Tools | ||||
|
|
AutoCAD | ||||
|
|
Microstation | ||||
|
|
Intools | ||||
| |
Conduct implementation strategy meetings with all parties who are affected by the planned project | ||
| |
Develop changeover strategies on retrofit projects where it is necessary to work around operations and outage schedules | ||
|
|
Prepare a detail execution schedule | ||
| |
Adapt the design strategy to the overall execution plan | ||
| |
Prepare a report for approval by the end user | ||
|
|
Put in place the necessary project management tools and personnel to monitor progress against the plan | ||